Net Metering
SIE Alert – 27th June 24

Net-Metering applicants above 100kW requires Load Flow Studies before interconnection.

The consultant should be :-

* Enlisted with Pakistan Engineering Council.
* Load Flow Studies on certified PSS/E Software.
* Board of Management Sundar Industrial Estate has not nominated any Consultant.
* Resident may engage any qualified Net Metering Consultant on their convenience.